韩国庆尚北道第VI产业技术工程学院
Architects: Baum Architects
Location: Gyeongsangbuk-do, Republic of Korea
Project team: Young Sung Shin, Sung Ho Son, Ho Soub Shin, Sung Hwan Choi, Ko Eun Lee, Ho Seok Lee
Project area: 4,082 sqm
Project year: 2009 – 2011
Photographs: Won Yang Kim
site plan
Our project, the Engineering College, is located between the Main Building and the New Technology Center. The Main Building was constructed thirty years ago while the New Technology Center is newly built, making a historical contrast between the two. Before the construction of the Engineering College, the site had been unused and not noticed. However, it is situated in the campus center and surrounded by nature, historical buildings and major pathways. During the site visit, we envisioned the potential value of the place.
© Won Yang Kim
Our intention was to make the project site as a campus core: a center space for academic and professional exchange. To this end, thin and linear masses are chosen for the new Engineering College building bridging the main building and the New Technology center. Forming a dynamic outdoor space, transparent and solid masses are stacked crossing each other. Each mass contains the required building programs. Korea Polytechnics VI – Engineering College in Gumi Campus is now working as the heart of the campus.
IMG2011061383992678.jpg
IMG2011061383993069.jpg
IMG2011061383993460.jpg
IMG2011061383991538.jpg
IMG2011061383991272.jpg
IMG2011061383991147.jpg
IMG2011061383990991.jpg
IMG2011061383990803.jpg
IMG2011061383990288.jpg
IMG2011061383989944.jpg
IMG2011061383989850.jpg
IMG2011061383992319.jpg
IMG2011061383992147.jpg
IMG2011061383991975.jpg
IMG2011061383991663.jpg
IMG2011061383990631.jpg
IMG2011061383990444.jpg
AI文本分析中……
AI色彩命名中……

序赞Ai时刻等待着你的命令!~

与Ai对话形式持续执行相关Ai智能体任务。

暂时没有评论,你回一个呗!~

您需要登录后才可以回帖 登录 | 注册序赞号

快速回复 返回顶部 返回列表